Xero-Turn™ AWD

Conquers terrain, cares for grass

EFLS™ NRTK

Ultra-precise with Network RTK+Vision positioning

Auto Mapping

Hands-free mapping in minutes

VisionFence™

AI-powered 150+ obstacle avoidance

Smart Security System

Stay notified, stay secure

Weather-Adpative Mowing

Handles five extreme conditions

59 dB(A)

59 dB(A)

Ultra-quiet operation

IP66

IP66

Dustproof and Waterproof

3-Year

3-Year

Up to 3 year warranty

Smart Home Ready

Works with Alexa & Google Home

Smart Security System

Stay notified, stay secure

EFLS™ NRTK

Ultra-precise with Network RTK+Vision positioning

Auto Mapping

Hands-free mapping in minutes

Xero-Turn™ AWD

Conquers terrain, cares for grass

Smart Home Ready

Works with Alexa & Google Home

VisionFence™

AI-powered 150+ obstacle avoidance

Weather-Adpative Mowing

Handles five extreme conditions

59 dB(A)

59 dB(A)

Ultra-quiet operation

IP66

IP66

Dustproof and Waterproof

3-Year

3-Year

Up to 3 year warranty

Power with Care

No Scraping, No Slipping,

No Damage

Rear-wheel coordination enables true zero-turn steering without tearing the turf, while the Traction Control System automatically adjusts traction on wet or uneven surfaces to minimize slippage. Mow without damaging your turf and achieve a perfect finish.

Load video: Load video:
Power That Adapts

Smarter Power Use, Up to 30% Energy Savings³

The adaptive rear wheel activates only when extra power is needed, conserving energy and extending runtime by as much as 30%.

No Boundaries, No Hassle

Eliminate buried wires and manual installs. Quick, automated mapping saves time and simplifies deployment.

Network RTK Access, Antenna-Free, No Extra Cost⁴

Network RTK access is included at no extra cost, and the required cellular data are provided free of charge.Tap once to connect. Enjoy standard Network RTK coverage at no extra cost, with fast, stable positioning for every mow.

One-Click Mapping, Minimal Human Effort

Just place your mower down! It scans and maps your entire lawn automatically, no manual setup required.

EFLS™ NRTK: Network RTK + Vision Dual Precision

Reliable Coverage, Seamless Accuracy, Anywhere

Unlock centimeter-level precision with upgraded tri-frequency Network RTK combined with Vision fusion positioning. Achieve 30 percent higher accuracy and stable signals even in tight, cluttered, or obstructed areas. Control your lawn with effortless, pinpoint precision.

Under Trees
Narrow Paths
Hidden Corners

VisionFence™ : AI-Powered Smart Detection

Intelligent Mowing, 150+ Obstacles Handled

Our AI-powered technology detects pets, tools, and even tiny obstacles , rerouting in just 0.1 second to keep a safe 1 meter distance. Safe, fast, and hassle-free. Your perfect lawn, guaranteed.

Animals
Small Objects
Everday Obstacles
Cat
Dog
Hedgedog
Squirrel
Rabbit
Cow
Sheep
Chicken
Hose Reel
Shovel
Shears
Brush
Garden Hammer
Power Strip
Solar Panels
Cement Pipe
Garden Light
Electric Saw
Football
Wood
Fountain
Fire Hydrants
Tires
Fence

The intelligent mower that truly works for you

Your Smarter Everyday Helper

<p>Smart anti-theft alerts you instantly if the mower is moved or lifted. Check its real-time location anytime for complete peace of mind.</p>
<p>Seamlessly integrates with Alexa and Google Home. Just say the word to start or stop mowing.</p>
<p>Detects rain, frost, snow, strong wind or heat automatically and returns to charge, ensuring safe operation in every season.</p>
Always Secure, Always Tracked
Voice-Controlled Convenience
Extreme Weather? Handled

Smart anti-theft alerts you instantly if the mower is moved or lifted. Check its real-time location anytime for complete peace of mind.

Seamlessly integrates with Alexa and Google Home. Just say the word to start or stop mowing.

Detects rain, frost, snow, strong wind or heat automatically and returns to charge, ensuring safe operation in every season.

Durable, dependable, and effortless to maintain

Built to Last. Designed for Ease

<p>Withstands rain, dust, and dirt. A quick rinse and your mower is ready to get back out there.</p>
<p>Ensures color and materials stay sleek year after year.</p>
<p>Includes 2-year battery coverage and a full 3-year product warranty for worry-free ownership.</p>
IP66 Weatherproof Protection
UV-Resistant Finish
3-Year Total Warranty

Withstands rain, dust, and dirt. A quick rinse and your mower is ready to get back out there.

Ensures color and materials stay sleek year after year.

Includes 2-year battery coverage and a full 3-year product warranty for worry-free ownership.

What's in the Box?

Navimow i2 AWD
x1
Antenna Installation Kit
x1
Charging Station and Installation Kit
x1
GNSS Antenna
x1
Pegs to Secure the Extension Cable
x1
Power Supply
x1
Spare Blades and Bolts
x1
Important Information and Quick Start Guide
x1

Spec & Compare

User Tips

Navimow App

Download Navimow App now for easy robot activation (supporting Bluetooth, Wi-Fi and 4G), user guidance, and remote control. Manage and control your Navimow at finger tips.

Download Now

FAQ

What are the upgrades of the i2 AWD series compared to the i1 series?

Compared to the Navimow i1 series, the i2 series features the following upgrades:
50% improved climbing capability, from 30% (17°) to 45% (24°); The upgraded powertrain enables the i2AWD series to overcome obstacles more effectively than the i1 series.
Built-in 4G module, No antenna needed;
All-terrain tires included;
Enhanced mowing efficiency with an upgraded blade disc from 3 to 5 blades;
Advanced mapping technology, with Auto Mapping for a more effortless experience.

What are the limitations of the working environment for the Navimow i2 AWD series?

The dimensions of the Navimow i2 AWD series are 21.4 x 15.1 x 11.2 inches. Please ensure sufficient clearance when passing through narrow obstacles.

Where is the best location in the yard to install the Navimow i2AWD series?

Many customers setup their robotic mowers at the edge of the lawn for easier access to a power source.

What voice control and manual operation options does the Navimow i2 AWD series support?

All Navimow robotic lawn mowers support voice control via Amazon Alexa and Google Home. For a hands-on mowing experience, you can also use your mower manually through the Navimow App.

What is the battery capacity and charging time of the i2 AWD series ?

i206 AWD: Battery capacity 2.55Ah; charging time 60 minutes per cycle; daily mowing area 0.37 acre / 24 hours
i208 AWD: Battery capacity 5.1Ah; charging time 120 minutes per cycle; daily mowing area 0.37 acre / 24 hours

What value-added services or products are available for the i2 AWD?

The Navimow i2 series includes lifetime free NRTK service. You may also opt for parcel insurance and return insurance to protect your order. Additionally, purchasing the i2 series entitles you to 1 year of free 4G data service.

1.Maximum Slope Ability: Measured under test conditions with 5 cm grass height, dry grass surface, and a slope free of obstacles.
2.Vertical Passing Ability: Measured on a flat surface with forward traversal of a 4 cm vertical step; cutting blade height set at 60 mm.
3.30% Energy Boost (On-Demand 3WD): Tested on flat, obstacle-free lawn at 25°C; energy consumption measured for on-demand 3WD versus full- time 3WD use over the same period.
4.Network RTK feature: Network RTK access is included at no extra cost, and the required cellular data are provided free of charge.